
Projects
Infrastructure | Temporary Diversion of Pumping Main – CRL106 Loyang Underground Station
As the lead M&E consultant, we delivered the temporary diversion of the existing PUB sewage pumping main to enable the construction of a major MRT interchange in a dense urban setting.

01
Original System
Innovative engineering solutions tailored to your needs. Our team of experts is dedicated to delivering exceptional results for every project.
02
Consultancy Solutions
Collaborate with us for cutting-edge design consultancy services. We ensure precision, efficiency, and excellence in every detail.
Challenge
PUB required balanced flows of 100 L/s per pipe to protect
downstream capacity.
03
Our Solution
worked closely with PUB to redesign the diversion, reinstating 4 pumps with twin pipes—ensuring reliability, resilience, and full compliance.
Management Expertise

The System
maintained safety, service continuity, and regulatory compliance throughout construction. This project reflects our commitment to engineering excellence, problem-solving, and collaborative leadership, contributing to a critical piece of Singapore’s national infrastructure.