top of page

​Projects

Infrastructure | Temporary Diversion of Pumping Main – CRL106 Loyang Underground Station

As the lead M&E consultant, we delivered the temporary diversion of the existing PUB sewage pumping main to enable the construction of a major MRT interchange in a dense urban setting.

01

Original System

Innovative engineering solutions tailored to your needs. Our team of experts is dedicated to delivering exceptional results for every project.

02

Consultancy Solutions

Collaborate with us for cutting-edge design consultancy services. We ensure precision, efficiency, and excellence in every detail.

Challenge

PUB required balanced flows of 100 L/s per pipe to protect

downstream capacity.

03

Our Solution

worked closely with PUB to redesign the diversion, reinstating 4 pumps with twin pipes—ensuring reliability, resilience, and full compliance.

Management Expertise

The System

maintained safety, service continuity, and regulatory compliance throughout construction. This project reflects our commitment to engineering excellence, problem-solving, and collaborative leadership, contributing to a critical piece of Singapore’s national infrastructure.

Designing with intent. Building with care.

bottom of page